Staff Answer
Jul 07, 2026 - 05:18 AM
Epoxy needs the slab at roughly 55°F and rising through application and initial cure, so unheated barns get coated in the warm months or with temporary heat. Our Fast Dry systems cure at lower temperatures if your window is marginal — ask when ordering. The tiles install in any season at any temperature, including January.
